Metro Madrid Data Processing Center
Works at Metro Madrid Data Processing Center has already begun. The fundamental objective of the design is service availability. Energy efficiency has been sought as a secondary objective to decrease the facility’s overall electricity consumption.
It should be emphasised that this centre will become Metro’s main DPC.
Currently, all Metro de Madrid information and data is processed in five different locations. To centralize all this information in one place, the suburban transport network has embarked on the construction of a new data processing center (CDP) in Canillejas. All the operation, maintenance and corporate computer systems will be located there.
As published by El Mundo, the new CDP facilities will have more than 8,000 square meters. And two IT rooms with a capacity for 150 racks.
That will unify all the information of the suburban transport network in one place. Its main objective is to collect all the data in a single point and simplify the rest of the locations.
The construction of the complex, which has a total investment of 11.7 million euros -co-financed with FEDER Funds from the European Union- will end during the summer of 2023. While its start-up is scheduled for the end of 2024.
Project in two phases
The idea behind the construction of this center is to have scalability. Therefore, the project is developed in two phases:
The first one focuses on the first of the technology rooms (which account for 40% of the entire center).
The second phase will involve the second information technology room, which will be equipped in the future according to the Metro’s growth needs.
This Data Processing Center will allow a more efficient and secure management. In addition to reducing energy consumption and improving the service.
Raised Access floors in technical rooms
The load capacity, the air flow and the electrostatic control are decisive when deciding the flooring in a technical room. At Polygroup we develop conductive raised access floor systems specially designed to guarantee the appropriate levels of safety and technology.
Our floors in the Madrid Metro Data Processing Center
At Polygroup we have participated in this project with a GAMAFLOR FULL STEEL raised access floor system to improve the distribution of the facilities in the technical rooms of the new chosen space.
The GAMAFLOR FULL STEEL flooring system obtains great resistance to fire and loads; It is ideal for use in this type of room as it allows full channeling of installations in the plenum.
The raised access floor system has been supplied with an antistatic CONDUCTILE SUPER-OR finish and PAC 35/05 HPV LIDER, providing significant cost savings in the development of your project due to its high value for money.
In addition, it has been complemented with GAMAFLOR G-42 perforated steel panels for the correct cooling of the room. The GAMAFLOR G-42 raised access floor grilles are made entirely of steel and are positioned in the room, creating cold aisles for the expulsion of air conditioning and refrigeration from the machinery.
This makes it highly resistant to both loads and fire, and being completely flat prevents vibrations caused by the expulsion of air.