Polygroup is participating in the supply and installation of the GAMAFLOR PAC 30/05 system with Position Touch ceramic finish for a new public employment building in Jaén — executed by Polygroup’s partner for this project. The system is being installed at a height of 180 mm.
A newly built institutional facility designed for public employment services, where the raised access floor system must simultaneously respond to three demands: full plenum access for the maintenance of electrical and data installations, durability under intensive and continuous public footfall, and an aesthetic coherent with the institutional character of the building.
Why GAMAFLOR PAC 30/05 with Position Touch ceramic finish
The GAMAFLOR PAC 30/05 system provides the technical foundation — pedestal and stringer structure with precise levelling at 180 mm and full plenum access with independently removable panels without special tools.
The Position Touch ceramic finish integrates the finish directly into the panel without conventional PVC edges, delivering a cleaner, more architectural aesthetic that integrates naturally with the interior design concept of the building — with the abrasion resistance, ease of cleaning and quality that a newly built institutional building demands.

Public infrastructure built to last
A public-service building in continuous operation requires a raised access floor system that responds to the operational demands of today and adapts to the needs of the coming decades — without construction works, without interruptions and without compromising the quality of the space.
At Polygroup, we work alongside architects, engineers and contractors on institutional and public-use projects across Spain, ensuring that the raised access floor solution is technically and aesthetically optimised before the first panel is installed.
Working on an institutional or public building project in Spain? Our technical team can support you from the very first sketch. Contact us.
