METRO LINE 2 OF SANTO DOMINGO





RAISED ACCESS FLOOR FOR HEAVY TRAFFIC
The LINE 2 OF METRO OF SANTO DOMINGO is part of a master infrastructure plan in the Dominican capital that started with Line 1 in 2005 and plans to create six metro lines over the next 20 years.Line 2 of the metro was inaugurated in 2013, with a trail that is totally buried underground, with a length of 34 km of railway track and 14 passenger stations.
The metro stations and technical zones for railway traffic control equipped with the latest technology, that required a raised access floor system GAMAFLOR PAC 35/05 with factory-applied finish HPL POLYSTRATIC in specific areas where special management of the facilities, which are channeled through the plenum created by the raised access floor structure.
POLYGROUP followed closely the development carried out by the company SOFRATESA for what will undoubtedly be a project that will go down in the history of the Dominican Republic and will continue to position the firm as a reference in the raised access floor systems in Central America.
To learn more about this project, please visit this link link.
ACCESS FLOOR FOR HEAVY TRAFFIC IN SANTO DOMINGO
Location: DOMINICAN REPUBLIC
Project Profile:
METRO STATIONS
Area: 1200 m2
Year: 2012
Product Type:
POLYGROUP GAMAFLOR PAC