Hisdesat Satellite Control Centre, Hoyo de Manzanares — Raised Access Flooring for Spain’s Most Advanced Space Communications Infrastructure
Some buildings are not just technically demanding. They are strategically critical. The Hisdesat Satellite Control Centre in Hoyo de Manzanares, Madrid, is one of them — a facility designed to manage Spain’s most advanced secure satellite communications programme, operating continuously and with zero tolerance for failure.
In 2024, Polygroup supplied 2,500 m² of raised access flooring for this project, designed by BOD Arquitectos and engineered by WSP Spain — combining three complementary GAMAFLOR systems to meet the specific technical requirements of each zone: GAMAFLOR PAC 35/05 with Lider finish, GAMAFLOR Full Steel for the most critical technical areas, and G-58 ventilation panels for UFAD airflow management.
A facility at the heart of Spain’s space communications strategy
WSP Spain designed the new Hisdesat satellite control centre in Hoyo de Manzanares — a project conceived to operate the SpainSat NG secure communications satellites, centralising all control operations in a single location.
The building, with a surface area of 4,362 square metres, has been designed to integrate into the natural environment, partially underground to reduce its visual impact. The two-level structure has implemented sustainable systems — including rainwater recycling, grey water reuse and photovoltaic canopies — with the objective of obtaining LEED Gold certification.
In a facility of this nature, managing real-time satellite communications for national security, every technical component must perform without interruption and be accessible for maintenance without compromising operational continuity.
Three systems for three critical environments
The complexity of the Hisdesat project required a multi-system approach to raised access flooring, with each system specified to meet the precise technical demands of its zone.
GAMAFLOR PAC 35/05 with Lider finish — office and operational areas
The GAMAFLOR PAC 35/05 system with Lider finish was specified for the office and operational areas of the facility. With a distributed load capacity of 33.33 KN/m² and a lightweight panel construction of 12.10 kg, the PAC 35/05 provides the structural performance and full underfloor accessibility required in operational workspaces. The Lider finish delivers the antistatic properties and wear resistance essential in environments with sensitive electronic equipment.
GAMAFLOR Full Steel — critical technical areas
For the facility’s most sensitive technical zones — control rooms, server areas and communications infrastructure — the GAMAFLOR Full Steel system was specified. With 0% moisture absorption, A1 fire classification and antiseismic performance certified to ASCE 7-10, the Full Steel system provides the structural integrity and long-term dimensional stability required in environments where equipment performance cannot be compromised.
The full underfloor accessibility of the system — independently removable panels extracted in seconds without special tools — ensures that all technical installations can be reached and serviced without interrupting the operational activity above.
G-58 ventilation panels — UFAD airflow management
The G-58 perforated ventilation panels — with 58% open area — allow precise control of the conditioned air supply from the underfloor plenum to the occupied zones. In a facility with continuous high-density electronic equipment generating significant heat loads, UFAD technology using G-58 panels provides the airflow management precision required to maintain optimal operating temperatures for both personnel and equipment.
LEED Gold: sustainability in a high-security environment
The GAMAFLOR PAC 35/05 system contributes directly to the LEED Gold certification objective — its recycled component materials are compliant with LEED certification parameters, making it a natural choice for projects where sustainability and technical performance must coexist.
2,500 m² of infrastructure that cannot fail
The Hisdesat Satellite Control Centre at Hoyo de Manzanares is one of the most technically complex and strategically significant projects in Polygroup’s portfolio in Spain. It demonstrates the capacity of GAMAFLOR systems to respond simultaneously to the demands of high-security environments, sustainable construction criteria and the most exacting technical performance requirements — in a single project, with a multi-system approach tailored to each zone.
At Polygroup, we work alongside architects, engineers and project teams on projects where the raised access floor is not a finishing decision — it is a core infrastructure decision.
Working on a critical infrastructure, defence or high-security facility? Our technical team can support your specification from concept to supply. Contact us.
