In 2024, the Energy Dome, one of the most emblematic projects within the Environmental Business Park of Castilla y León (PEMA) in Soria, continued its transformation into a major institutional, educational and business facility. Promoted by the Regional Government of Castilla y León, designed by Tuñón, Mansilla & Albornoz Architects and engineered by Urculo Ingenieros, the building combines singular geometry, sustainability and next-generation construction solutions.
As part of this development, Polygroup supplied more than 3,000 m² of GAMAFLOR raised access flooring systems:
-
GAMAFLOR PAC 30/05/05 with carpet applied on site
-
GAMAFLOR PAC 30/05 with factory-applied Rock carpet finish
These systems were selected to meet the building’s demanding functional, acoustic and operational requirements.
A Geometric Concept Based on the Fragmentation of the Sphere
The architectural concept is based on a semi-spherical volume that, through processes of fragmentation, sectorisation and unfolding, generates seven interconnected sectors. This strategy enables the creation of flexible, adaptable and highly functional spaces that relate to each other and to the landscape.
The Energy Dome sits on a 21,402 m² site and reaches a built area of 11,366 m², integrating seamlessly into the PEMA thanks to its landscape design and the absence of perimeter enclosures.
Polygroup’s Contribution: High-Performance Solutions for a Modular and Evolving Building
The fragmented and multifunctional nature of the Dome requires interior systems capable of supporting growth, installation upgrades and changing uses over time.
Polygroup’s GAMAFLOR PAC 30/05 and PAC 30/05/05 systems provide:
1. Structural stability for intensive-use spaces
Their design ensures high load performance and continuous service in educational, administrative and public-use areas.
2. Full accessibility to technical installations
The building integrates extensive electrical, HVAC, communications and pumping systems.
The raised floor allows fast intervention, efficient maintenance and future extensions without destructive works.
3. Flexibility to adapt each sector to new functions
Thanks to the system’s modularity, each space can evolve to accommodate administrative, training, business or institutional uses with minimal disruption.
4. Acoustic performance and user comfort
Both the factory-applied Rock carpet and the on-site installation improve acoustic absorption and walking comfort — essential in teaching and work environments.
5. Speed and uniformity during installation
Combining factory-finished panels with in-situ carpet solutions allowed optimisation of time and ensured consistent aesthetics across different zones.
A Strategic Project for Regional Development
The Energy Dome forms part of a broader commitment by the Regional Government of Castilla y León to revitalise Soria through innovative, sustainable infrastructure aligned with knowledge, technology and economic development.
Its architectural identity, multifunctional programme and technical solutions — including Polygroup’s GAMAFLOR PAC systems — demonstrate how public buildings can combine design quality, performance and long-term adaptability.
Polygroup is proud to contribute to this project with raised access floor systems designed to deliver durability, safety and flexibility in one of the region’s most strategic institutional facilities.