In 2024, the Border Control Post (BCP) of Cartagena, promoted by the Port Authority of Cartagena, incorporated advanced building solutions to ensure maximum operability, durability, and technical reliability.
As part of the project developed by COLTEC Ingeniería, Polygroup supplied the raised access floor system GAMAFLOR PAC 35/05 with porcelain finish, a solution designed specifically for public facilities and logistics environments that demand structural strength, easy maintenance, and full accessibility to technical services.
A Strategic Facility Within the Port of Cartagena
The Border Control Post is a critical facility responsible for the sanitary, documentary, and physical inspection of goods arriving from non-EU countries. Its daily operations require:
-
Continuous and efficient flow of goods
-
Durable building materials for intensive use
-
Immediate access to inspection equipment and technical installations
-
Strict compliance with hygiene, safety, and environmental standards
A facility of this nature demands interior systems that perform reliably under constant operational pressure.
GAMAFLOR PAC 35/05: Engineered for Structural and Operational Demands
The GAMAFLOR PAC 35/05 system was selected for its balance between mechanical resistance, dimensional stability, and full accessibility to the underfloor plenum.
Its main advantages for this project include:
1. High Structural Load Capacity
The PAC 35/05 system is engineered to withstand the continuous movement of technical staff, inspection carts, light machinery, and specialised equipment.
2. Total Modularity and Immediate Accessibility
Panels can be lifted individually, allowing fast access to electrical networks, data systems, HVAC, and inspection technologies without interrupting operations.
3. Dimensional Stability and Reliable Performance
The system maintains consistent behaviour under variable loads and constant use, supporting long-term building performance.
4. High-Performance Porcelain Finish
The porcelain surface provides:
-
Excellent resistance to wear and impact
-
Optimal hygiene and easy cleaning
-
Long-lasting aesthetics
-
Suitability for demanding public and logistic environments
Safety, Efficiency and Operational Continuity
The Cartagena BCP operates under highly controlled conditions. Raised access flooring plays a key role in supporting:
-
Fast technical interventions without downtime
-
Organised and protected technical installations
-
Adaptability to future technological updates or expansions
In high-demand environments, flooring must perform with the same precision and reliability as the rest of the infrastructure.
A Step Forward in the Modernisation of Port Infrastructure
The Port Authority of Cartagena continues to invest in upgrading its facilities by choosing constructive solutions that guarantee performance, safety and long-term efficiency.
The collaboration with COLTEC Ingeniería and the integration of the GAMAFLOR PAC 35/05 system reinforce this commitment and position the Port of Cartagena as a benchmark in the development of high-level logistic and border control infrastructure.
